How to dramatically slow down renewable energy in South Africa. Take a qualification which takes a month in the USA and make it 2.5 years in South Africa!!
These are my official comments:
"2.5 years to do something that can be done in one month in the USA.
"I agree that we need inspectors and perhaps this qualification is more suited to inspectors. However, there are many people who are already installing very competent systems in South Africa and some like mine, which meet the USA NEC Article 690 requirements as far as possible."
http://www.record.org.za/news/item/the-summary-of-qualification-content-pv-technician-for-public-comment#comment-30461
No comments:
Post a Comment